Experience

Explore my experience in Power Platform delivery, solution architecture, and operations. Select a role to see more details.

2026
 
 

2023

 
 

Perficient II / Vanti

September 2023 to July 2026

Solution architecture & technical leadership

  • Lead end-to-end solution architecture and technical strategy for Power Platform and AI projects, from requirements and feasibility through deployment and production monitoring.
  • Design solutions across Canvas and model-driven Power Apps, Power Automate Cloud and Desktop, SharePoint, Dataverse, REST APIs, and Azure AI tools.
  • Design and deploy conversational AI agents and intelligent copilots with Microsoft Copilot Studio, integrated with enterprise data and workflows.
  • Lead and mentor a team of three Power Platform developers, establishing development standards, governance frameworks, and best practices.
  • Deliver 15 production projects, including Canvas apps, Cloud flows, Desktop flows, and SAP GUI automation.

Fortion SAS

January 2023 to September 2023

Power Platform delivery

  • Develop Canvas and model-driven applications in the Microsoft 365 ecosystem for standardized data entry and improved user experience.
  • Build Power Automate Cloud flows to streamline document management and reduce manual work in document-table generation.
  • Deliver an end-to-end document-management solution using a Canvas app, Dataverse, Cloud flows, and Power BI reporting for process tracking.
 
 

2023

 
 

Computec Outsourcing

July 2016 to August 2022

Functions

  • Lead new projects in order to improve operations and get savings
  • Coordinate the operation of data processing and digital delivery of documents
  • Follow up of the process assuring service level agreements
  • Design and analyize Key Process Indicators
  • Elaborate work schedules of operational staff

Achievements

  • Creation of flows and apps on Power Platform which led to optimize process times and control
  • Task Automation with the implementation of visual basic and SQL applied on MS Excel and Access
  • Developed application through Access for quality and process control
  • Stablish strategies to ensure continuous flow and minimize process times
 
 

2016

 
 
 
 

2010

 
 

Maviltex sas

Nov 2010 to Sept 2015

Functions

  • Coordinate the production of bath dresses (apparel industry) managing the production resources in the most efficient way
  • Planning and controlling the fulfillment of production and maintenance plans across all areas of the enterprise
  • Stablish strategies to reduce cycle time

Achievements

  • Creation of apparel production modules (cells)
  • Elaboration of procedure for styles changes applying smed, obtaining decreased downtimes: 16% to 10% in 2013, 5% in 2014%, 3% until August 2015
  • Plant redistribution minimizing material and people movements
  • Optimization of manufacturing process time applying methods engineering

Nicole sas

July 2008 to November 2010

Functions

  • Line balancing of manufacture cells
  • Methods and time analysis
  • Develop machine distribution of each style to optimize production flow

Achievements

  • Reduction of machine idle times with the use of planning sheet
 
 

2008